
Callan Renewables
AD Plant
Coalisand
Clyde Shanks prepared a full planning application for a Centralised Anaerobic Digestion(CAD) plant outside Coalisland for Callan Renewables. The planning process involved public consultation and arranging a ‘study trip’ to an operational AD plant for residents and local MLA’s. The application was approved despite much public objection.
Waste
Show All Sectors